Tile removal is more than lifting the visible finish. The condition of the screed and the route for debris often determine the real scope.
Inspect before demolition
Photograph the floor, thresholds and visible cracks. Ask whether the quote covers tiles and adhesive only or the screed as well. Tell the tiler about pipes, cables or underfloor heating before tools touch the floor.
What happens on site
The crew protects adjacent finishes, opens the floor in sections and inspects the exposed base. Agree on working hours and dust control with the building. Moisture or a weak screed discovered underneath should be documented and approved before extra work starts.
Debris and final quote
List demolition, bags, carry-out, transport and lawful disposal separately. Share the floor number, lift access and parking restrictions. Levelling and waterproofing for the new floor are different stages and should appear as separate items.
Include in your request
- Area in square metres and existing tile type.
- Whether screed and skirting must also be removed.
- Floor, lift, parking and disposal access.
- Photos of thresholds and possible services under the floor.
Frequently asked
Can old tiles be kept intact?
Sometimes individual tiles survive, but strong adhesive makes this uncertain. If reuse matters, ask for a careful removal method and a separate quote.
Is disposal included?
Not necessarily. Ask for bags, loading, transport and disposal to be itemised, including access from the apartment to the vehicle.
When can new tiles be laid?
Only after the base is checked for strength, moisture and level. A replacement screed or waterproofing layer adds curing time according to its system instructions.