Task details1%
Cold water distribution is the part of the system that gets the least attention in Israel, but it's the most exposed to hard water and 4–6 bar inlet pressure. A proper cold-water run is laid during renovation and lasts 30–50 years untouched. A bad one starts weeping in 3–5 years and drags several walls down with it.